"Reason is always a kind of brute force; those who appeal to the head rather than the heart, however pallid and polite, are necessarily men of violence. We speak of 'touching' a man's heart, but we can do nothing to his head but hit it." --G.K. Chesterton
Showing posts with label Coquitlam River. Show all posts
Showing posts with label Coquitlam River. Show all posts

Saturday, December 3, 2016

Lafarge tour underlines scope of work, reveals surprises




Looking south across lower part of reclamation site.
The four-wheel-drive pickup truck works its way slowly up a steep, rocky road, as a group of Lafarge Canada executives and I tour the company's huge pit area off Pipeline Road in Coquitlam.

It's clear the landscape has been considerably altered by the decades-long extraction of gravel from the site, and that Lafarge's current reclamation project is a massive undertaking.

How massive? Costs for security alone, including a 24-hour-a-day, two-person crew, are $1.5-million a year. Overall costs are a company secret.

As we trundle up the rough road, Nick Leuzinger, Operations Manager, GVA Aggregates; Chen Mei, VP Aggregates, Greater Vancouver Aggregates Division; and Patrick Dobbyn, Land & Resource Manager (and the man who arranged this early-December tour), point to areas where work needs to be done: hillsides have to be stabilized to the extent that, ironically for a site from which thousands upon thousands of truckloads of aggregate were extracted, structural fill has to be trucked into the site.

Coincidental to my tour (which was sparked by the wrapping up of the Coquitlam River Aggregate Advisory Committee, which I had chaired), the company's request for a Conservation Permit, to facilitate its reclamation work, will be before Council on Monday, Dec. 5. Please click here to read the report.

Operating as Coquitlam Sand and Gravel, Lafarge Canada Inc. was, for many years, one of the major aggregate-industry operators along the Coquitlam River. However, after costs to operate the company's 37-hectare pit on Pipeline Road became too high due to the high level of fine sediments in the gravel deposits, the company decided to cease operations on the site.

Lafarge is now in the midst of a major reclamation project at the site, one whose goal is to stabilize the site and return it to a safe, natural state, removing all general structures and roads, disposing of fuels and other toxic materials, delineating the watershed and improving drainage, and instituting a re-vegetation plan.
Entrace to "hidden valley" of reclaimed main pit.
The company's plan is to complete the reclamation by 2018 and, after monitoring to ensure that the reclamation is successful, return the 87-hectare site to the Crown in 2021. After that, it may well become an attractive destination for hikers and mountain bikers. Views from the site to Burke Mountain (to the east) are spectacular, and the terrain -- natural and man-made alike -- is most interesting.*
Hillside of reclaimed main pit: Look closely to see four deer.

Of special note are two features. First is the new Mantle Creek watercourse that Lafarge is constructing. Designed to mimic natural flowing patterns, the new watercourse will be built to handle the most extreme rainfalls. Especially impressive are the extensive rock-works (aka rip-rap) and holding pond at the base of the new course.

Second is the Main Dig Site in the upper (southwest) corner of the site. Lafarge's extraction of millions of tonnes of material has created a massive, crater-shaped, amphitheatre-like valley which, now that it has been re-vegetated, is already home to a herd of rambunctious black-tailed deer.
At base of new Mantle Creek.
The only easy way to get into the valley is via a single roadway through a gap in the valley, which gives the visitor a rather dramatic and sudden view of this otherwise hidden gem.

One can imagine that, decades in the future, the valley will be a favourite destination for picnickers or maybe even the site of al-fresco concerts, with thousands of spectators lining the valley slopes.

For now, though, the entire site is off-limits to the public. Movie-goers will, however, have a chance to see some of the site's spectacular, steep and forested lands next summer when the latest Planet of the Apes instalment, War for the Planet of the Apes, is released; the production spent several months shooting on location this past summer, going so far as to build a fort at the top of a steep ravine that forms part of the future Mantle Creek watercourse.


*Long-term plans for the site are uncertain, as the property is outside Metro Vancouver's urban-containment boundary and, as such, is also not part of Coquitlam's Northwest Burke Visioning process.

Tuesday, March 5, 2013

Celebrate Coquitlam River success

Page from the City's Coquitlam River Water Quality Monitoring Report

Ponderous, doom-and-gloom predictions from the sky-is-falling eco-hysterical crowd are routine fare in the mainstream media, even as increasing scientific evidence shows that we have reason for optimism. I’ve been chronicling many of the good-news reports over the past year on my Facebook page.  And I certainly hope to add another link to this list of good-news stories tomorrow, when our two local newspapers publish. [Yup, here's a link to the Tri-City News' story. And here's a link to the Now's story.]

That’s because the City of Coquitlam has just released a report finding that, contrary to the impression left by the annual ritual of naming the Coquitlam River to the list of the province’s “most endangered rivers,” the river is actually exceedingly healthy.

I personally am gratified with this finding because, as chair of the Coquitlam River Aggregate Committee (which seeks to balance the needs of the important gravel-extraction operations along the river, with those of the environment), I stuck my neck out last spring when Mark Angelo, Rivers Chair of the Outdoor Recreation Council, once again slapped the “endangered” label on the river.

I responded by saying that everything I was hearing at the committee—from groups as diverse as our own environmental experts to the federal Department of Fisheries and Oceans—had led me to conclude that the river was not, in fact, endangered. My decision to speak up, for the good work that had been done by the committee and many others, led to no small bit of controversy.

It also led directly to my decision to press the City to conduct its own, unique water-quality tests. After all,  the City has a great many storm-sewer outfalls that pour water directly into the river; it only made sense that we should know what’s coming out of them.

Yesterday, we found out.  The Coquitlam River Water Quality Monitoring Update report declares that “sampling results for the 2012 Coquitlam River water quality monitoring program indicate overall positive watershed health, with the majority of parameters being achieved at all locations during both dry and wet weather conditions.”  Significantly, the few problems that were identified (slightly low dissolved oxygen levels throughout the river and an elevated dissolved-copper level in the Riverbend area) cannot be attributed to the aggregate operators.

Let there be no misunderstanding: this is great news! It shows that the gravel operators are acting responsibly; it shows that committed, focused efforts by government workers, environmentalists, nature lovers and ordinary volunteers can make a difference; and it shows that the Coquitlam River is alive, vibrant and healthy. Truly, this is something to celebrate.

Tuesday, December 4, 2012

Good news about the Coquitlam River

You might remember that, several months ago, an enviro-activist included the Coquitlam River on a list of allegedly "endangered" rivers in B.C., and I responded in council by saying that, in fact, the river was doing very well.

Heavy natural runoff in a Coquitlam stream in
the Westwood Plateau area, Dec. 4. (photo by Terry O)
However, I was challenged by some local residents to explain how I could conclude this when the City itself didn't know what was being discharged into the river from its storm sewers. It turns out that they had a good point.

One thing led to another and, after some meetings with City staff during which I, acting as chair of the Coquitlam River Aggregate Committee, pressed for the sort of testing that the residents were suggesting , I am proud to say that the City has now started a comprehensive testing program.

This should finally be able to determine to what extent any siltation that gets into the river (and much less siltation is taking place in recent years, anyway) is attributable to natural sources, storm-sewer discharges, or the aggregate (gravel) operations alongside the river in the north-central portion of the City.

Here's the text of the press release that the City issued about the testing program this morning:

Coquitlam River Water Quality Monitoring Underway


COQUITLAM, BC, December 4, 2012 – City of Coquitlam has begun water quality monitoring of the Coquitlam River to help build a reliable and current database of water quality information. The resultant data will be a huge tool to inform the community about the watershed's health in its urban environment.

“The City has looked at the monitoring and habitat restoration projects that have been undertaken along the Coquitlam River in recent years by various agencies and the many stewardship groups to see what kind of water quality monitoring data is available. While there's great work being done, consistent monitoring of the lower reaches of the River from the Coquitlam Dam to Colony Farm has not been occurring, so the City has developed a sampling program to help fill that gap," confirms Steffanie Warriner, Manager, Environmental Services.

The program involves a series of five sampling days at seven locations along the length of the Coquitlam River. Sampling will take place in the the late spring and the late fall so that both dry and wet season conditions are captured. The tests were selected on the basis of their importance to fisheries values and as indicators of healthy streams.

“Coquitlam River is a vital local asset, and Coquitlam has been taking the lead on a number of environmental stewardship projects for the river,” says Coquitlam Mayor, Richard Stewart. “One important activity is the role the City plays chairing the Coquitlam River Aggregate Committee, an advisory body with a mandate to monitor responsibility by all levels of government, the aggregate industry and other stakeholders to improve the health of the Coquitlam River. This work is contributing to some of the important improvements we're starting to see in the river."

Other improvements the City will be undertaking in 2013 include upgrading existing culverts on Fulawka Creek that flows into Coquitlam River in order to prevent flooding and debris jams. A larger project includes compiling a repository of information on the activities that the many different groups within the watershed have been involved in as they relate to gathering data or restoring habitat along the River.These groups include: stream keepers, BC Hydro, Department of Fisheries and Oceans Canada, Metro Vancouver and representatives of the aggregate industry.

The City of Coquitlam has also played a leadership role in the development of the Coquitlam River Watershed Roundtable. The Roundtable coordinates and implements activities aimed at promoting the long-term sustainability of the Coquitlam River watershed. Now entering its second year, the Roundtable Core Committee began work on new projects including an educational watershed cafe series, and the first steps towards developing a Coquitlam River Watershed Plan. More information about the Roundtable, and opportunities to become involved, can be found on their website, www.coquitlamriverwatershed.ca

-30-

For more information, contact:
Steffanie Warriner
Mnager, Environmental Services
P: 604-927-3536